Electrical Rough-In | 6/29/2020 | 6/30/2020 | 6/30/2020 | A | PASS |
Mark Moncarr
|
|
|
Wall cover inspection for remodel and addition. contact HP ###-#### Thank you Phone #: ###-#### Inspection requested via web by Steve Blackmer Ok cover up and downstairs
|
Permanent Service | 6/24/2020 | 6/25/2020 | 6/25/2020 | P | PASS |
Mark Moncarr
|
|
|
Service change on remodel project. Contact is HP. Thank you Phone #: ###-#### Inspection requested via web by Steve Blackmer p/s o/h n ok
|
Conference | 6/17/2020 | 6/17/2020 | 6/17/2020 | A | PASS |
Rock A. Hudson
|
|
|
Site Contact is HP Honeycutt. Would like to review existing conditions with AHJ and determine what existing is acceptable to remain. Thank you Phone #: ###-#### Inspection requested via web by Steve Blackmer 3 bedroom areas no planned upgrades ok to remain and refeed, and minimum work space shall be provided for bsement sub panel location, may be a little tight on height.
|