Permanent Service | 7/22/2020 | 7/22/2020 | 7/22/2020 | P | FAIL |
Rock A. Hudson
|
|
|
We need a permanent service inspection for the Verizon disconnect at the SW corner of 6th ; State. Please call Joe with any issues or questions. ###-#### Phone #: ###-#### Inspection requested via web by Joe McLean 250.24- Electrical service Shall have a grounding electrode conductor installed and connected to the grounded conductor. 250.50- If a grounding electrode is not present one shall be installed as described in 250.52 1 thru 7.
|