Final | 6/26/2020 | 6/29/2020 | 6/29/2020 | P | PASS |
Tom Saunders
|
|
|
Call Joe Davis @ ###-#### for directions to Planter located at Darigold. Work done was new lift station. Phone #: ###-#### Inspection requested via web by Todd Alder... control panel installed...galvanized to pvc pipe installed...seal-offs at lift installed...ok to cover...power done by others...ok to final
|