Final | 7/29/2020 | 7/29/2020 | 7/29/2020 | P | PASS |
Mark Moncarr
|
|
|
Final inspection for solar/service upgrade Phone #: ###-#### Inspection requested via web by Sean Patton Ok final.
|
Permanent Service | 7/27/2020 | 7/27/2020 | 7/27/2020 | P | PASS |
Mark Moncarr
|
|
|
Need re-inspection for permanent service. Idaho Power shut down power so we can tap new solar into service feeders. Need inspection to restore power. Ready by 12 Phone #: ###-#### Inspection requested via web by Sean Patton Received pic of 2nd grd rod, and line side connection in meter main. p/s o/h rec ok
|
Conference | 6/30/2020 | 7/1/2020 | 7/1/2020 | A | DONE |
Mark Moncarr
|
|
|
Need direction on homemade pool.... Phone #: ###-#### Inspection requested via web by Sean Patton During a service inspection I saw a portable pool on the property that was surrounded by secondary and primary power within the 10' horizontal zone. Asked homeowner (Ashley Alexander) via phone call to verbally commit to removing pool upon final of service. She accepted.
|
Rough-In Permanent Service | 6/30/2020 | 6/30/2020 | 6/30/2020 | P | PASS |
Mark Moncarr
|
|
|
Will be ready by 1-2pm. Phone #: ###-#### Inspection requested via web by Sean Patton Met with contractor onsite for service inspection. Question was raised about portable pool at back of property. Talked to homeowner and received a verbal agreement that pool would be removed by final. 2 overhead secondary drop in 10' horizontal zone, and primary voltage was also in 10' zone. Life safety is involved. p/s o/h rec ok
|