Electrical Rough-In | 6/30/2020 | 7/1/2020 | 7/1/2020 | A | PASS |
Mark Moncarr
|
|
|
Underground and bonding for swimming pool. Access granted through construction entrance on left side of residence Phone #: ###-#### Inspection requested via web by Lars Johnson Ok cover grd work, 4 corners, 3 lts E side and main bond back to equipt.
|