Conference | 8/13/2020 | 8/13/2020 | 8/13/2020 | P | PASS |
Rock A. Hudson
|
|
|
Discuss grounding and bonding Phone #: ###-#### Inspection requested via web by Jason Parke Discussed the installation of a common grounding electrode conductor from level 1 service location to the other service locations and tapping off to provide a grounding electrode conductor to each service. As long as connection comply with 250.64 and are listed for grounding and bonding... plan looks good. Thanks.
|
Electrical Rough-In | 8/10/2020 | 8/10/2020 | 8/10/2020 | A | PASS |
Rock A. Hudson
|
|
|
Wall rough in at 3rd and 4th floor apartments Phone #: ###-#### Inspection requested via web by Jason Parke Levels 3 and 4 apartment walls rough in ok cover
|
Conference | 8/6/2020 | 8/6/2020 | 8/6/2020 | A | PASS |
Rock A. Hudson
|
|
|
Conference visit to discuss routing of feeders for 3rd and 4th floor apartments and the units 5/6/7/8 that sit above them and materials to be used. Also pre-inspect on 3rd and 4th floor apartment walls Phone #: ###-#### Inspection requested via web by Jason Parke Decided not to pre-inspect units, Discussed the wiring methods required when running from type 1 construction to type 3 construction. As per 338.10(B)(4) SE cable shall be installed as per 334 part 2. 334.10(5)- NM and SER cable OK to be installed in type 1 and 2 construction as long as installed in a raceway rated for these types of construction. As per annex E types 1 and 2 construction wiring methods shall be of non- combustible type. Flexible metal conduit OK. Short runs of conduits or raceways OK as per 300.10 ex1, 300.12, 300.16(B), bushing required where cable emerges for raceway. 250.86 ex2- addition bonding not required.
|
Electrical Rough-In | 7/20/2020 | 7/21/2020 | 7/21/2020 | P | PASS |
Rock A. Hudson
|
|
|
Wall rough in at garage parking office/data rooms Phone #: ###-#### Inspection requested via web by Jason Parke Parking garage east rooms wall rough in ok cover.
|