Final | 7/29/2020 | 7/29/2020 | 7/29/2020 | P | PASS |
Mark Moncarr
|
|
|
Ok with video/photo if needed /// Ryan Phone #: ###-#### Ok final
|
Electrical Rough-In | 7/22/2020 | 7/23/2020 | 7/23/2020 | A | PASS |
Mark Moncarr
|
|
|
Screened- will be be able to do video inspection Ryan Phone #: ###-#### Ok cover 2 sheds, access needed for flex connections in wall below panel in house
|
Conference | 7/7/2020 | 7/8/2020 | 7/8/2020 | A | DONE |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Ryan Bennett Discussed install of power to 2 sheds in backyard.
|