Final | 8/12/2020 | 8/13/2020 | 8/13/2020 | A | PASS |
Rock A. Hudson
|
|
|
The disconnect is ready for final inspection. Ohm report has been sent to inspector. Please call Joe with questions. ###-#### Phone #: ###-#### Inspection requested via web by Joe McLean Final ok
|
Permanent Service | 8/7/2020 | 8/10/2020 | 8/10/2020 | A | PASS |
Rock A. Hudson
|
|
|
The disconnect located on the traffic pole at the SW corner of Emerald ; Roosevelt has been installed, wired, and grounded, and is ready for inspection. Please contact Joe with questions. ###-#### Phone #: ###-#### Inspection requested via web by Joe McLean p/s u/g n ok
|
Permanent Service | 8/6/2020 | 8/7/2020 | 8/7/2020 | A | NR |
Rock A. Hudson
|
|
|
The disconnect located on the traffic pole at the SW corner of Emerald ; Roosevelt has been installed, wired, and grounded, and is ready for inspection. Please contact Joe with questions. ###-#### Phone #: ###-#### Inspection requested via web by Joe McLean Waiting for ground resistance test results to be provided, rest good.
|