Final | 8/12/2020 | 8/13/2020 | 8/13/2020 | A | CANC |
Eric Story
|
|
|
virtual inspection // Shawn Phone #: ###-#### Called for virtual inspection/no answer or call back
|
Conference | 7/21/2020 | 7/23/2020 | 7/23/2020 | P | PASS |
James Ady
|
|
|
Shawn- */Requesting Virutal Conference*/ Phone #: ###-#### discussed installation of transfer switch, pvc conduit sch 80 below 8ft, #10 THHN for 30 amp feed
|