Final | 7/27/2020 | 7/27/2020 | 7/27/2020 | P | FAIL |
Eric Story
|
|
|
Final Please Phone #: ###-#### Inspection requested via web by Kendra Lanham Panel directory needs labeled for final
|
Permanent Service | 7/24/2020 | 7/24/2020 | 7/24/2020 | P | PASS |
James Ady
|
|
|
Replace load center on 100amp underground fed electrical panel - Phone #: ###-#### Inspection requested via web by Kendra Lanham ID power had a late disc. Panel being replace due to bad utility phase conductor. 2 ground rods driven and all peices needed to complete panel swap onsite. p/s u/g rec ok
|