Rough-In Permanent Service | 8/6/2020 | 8/6/2020 | 8/6/2020 | P | PASS |
Rock A. Hudson
|
|
|
Please call if you need. Thanks, Jeff Creek ###-#### Phone #: ###-#### Inspection requested via web by Andrea Creek Rough in ok cover p/s u/g n ok
|
Electrical Rough-In | 8/6/2020 | 8/6/2020 | 8/6/2020 | P | CANC |
James Ady
|
|
|
Please call if you need. Thanks, Jeff Creek ###-#### Phone #: ###-#### >> Inspection requested via web by Andrea Creek Inspection cancelled from web by: Andrea Creek
|
Rough-In Permanent Service | 8/5/2020 | 8/5/2020 | 8/5/2020 | P | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Andrea Creek 250.24(A)(5)- On load side of service disconnecting means the grounded conductors shall not be connected to non-current carrying metal parts. Sub panel all equipment grounding conductors shall terminate in a ground bar seperate from the grounded conductors. Remove main bond screw. 408.41- In the panel board all grounded conductors shall terminate in an individual termimal that is not also use for another conductor.
|
Electrical Rough-In | 8/5/2020 | 8/5/2020 | 8/5/2020 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Andrea Creek House rough in ok cover.
|