Electrical Rough-In | 8/11/2020 | 8/13/2020 | 8/13/2020 | A | PASS |
Tom Saunders
|
|
|
This is for a cover and four corners bonding... There''s an area where the equipment is going to go that they haven''t dug out... I want the cover for the trenches next to the Pool and along side the building for the Main Service Feed... Any questions please call me... The Pool Company has a Re bar Inspection called for Wednesday as far as I understand and then they''re scheduled to cover the ditches... Phone #: ###-#### Inspection requested via web by JOHN MCCURDY... area list above ok to cover 4 corners and bonding for cover...ok
|
Electrical Rough-In | 8/10/2020 | 8/11/2020 | 8/11/2020 | P | CANC |
Tom Saunders
|
|
|
This is for a cover and four corners bonding... There''s an area where the equipment is going to go that they haven''t dug out... I want the cover for the trenches next to the Pool and along side the building for the Main Service Feed... Any questions please call me... The Pool Company has a Re bar Inspection called for Wednesday as far as I understand and then they''re scheduled to cover the ditches... Phone #: ###-#### Inspection requested via web by JOHN MCCURDY.... rescheduled to Thursday AM...no building permit assigned or issued
|