INSP - Final | 9/5/1995 | 9/5/1995 | 9/5/1995 | A | PASS |
Jack Frank
|
|
|
7MIN
|
INSP - Final | 9/5/1995 | 9/5/1995 | 9/5/1995 | P | FAIL |
Jack Frank
|
|
|
NOT READY/12MIN
|
INSP - Final | 9/1/1995 | 9/1/1995 | 9/1/1995 | A | FAIL |
Jack Frank
|
|
|
NEC 210-8 BASEMENT GFCI/17MIN
|
INSP - Framing/ Rough-in | 7/10/1995 | 7/11/1995 | 7/11/1995 | | PASS |
Jack Frank
|
|
|
25 MIN
|
INSP - Permanent service | 7/11/1995 | 7/11/1995 | 7/11/1995 | | PASS |
Jack Frank
|
|
|
10 MIN
|