INSP - Final | 1/25/1996 | 1/25/1996 | 1/25/1996 | P | PASS |
Jim Schmer
|
|
|
DEMO OF EXISTING TICKET AND CONCESSION BLDG 2 NEW ENTRACE.
|
INSP - Final | 1/16/1996 | 1/16/1996 | 1/16/1996 | P | PASS |
Jim Schmer
|
|
|
FINAL ON BLD A
|
INSP - Permanent service | 12/22/1995 | 12/22/1995 | 12/22/1995 | P | PASS |
|
|
|
53/OK/200 AMP/UG/COMM/NEW/I.P. ALREADY CONNECTED AND METERED 2 PANELS
|
INSP - Electrical Rough-In | 11/20/1995 | 11/20/1995 | 11/20/1995 | P | PASS |
|
|
|
11/20/95 311 - BLD B./ 09/OK/WALLS & CEILINGS/COMM/NEW
|
INSP - Permanent service | 11/7/1995 | 11/7/1995 | 11/7/1995 | P | FAIL |
|
|
|
11/07/95 311 - 53/CORR INSTALL ISOLATED NEUTRAL TO METER NEUTRAL BAR
|
INSP - Permanent service | 11/7/1995 | 11/7/1995 | 11/7/1995 | | PASS |
|
|
|
/ / 311 - 53/OK/60 AMP/UG/3 PH/COMM/NEW/CIP/METER DEPT
|
INSP - Electrical Rough-In | 10/30/1995 | 10/30/1995 | 10/30/1995 | P | PASS |
|
|
|
CEILING
|
INSP - Framing/ Rough-in | 10/30/1995 | 10/30/1995 | 10/30/1995 | | PART |
|
|
|
/ / 311 - 09/OK/COMM/WALLS & CEILINGS/BLDG A
|
INSP - Electrical Rough-In | 10/20/1995 | 10/20/1995 | 10/20/1995 | P | PART |
|
|
|
10/20/95 311 - 09/OK/PARTIAL/EXTERIOR WALLS/COMM
|
INSP - Permanent service | 10/17/1995 | 10/17/1995 | 10/17/1995 | | PASS |
|
|
|
/ / 311 - 53/OK/COMM/NEW/400 AMP/UG/CIP
|
INSP - Miscellaneous | 10/12/1995 | 10/13/1995 | 10/13/1995 | A | PASS |
|
|
|
10/12/95 311 - SLAB - 03/U.G. CONDUIT IN BLDG./OK
|
INSP - Electrical Rough-In | 9/6/1995 | 9/6/1995 | 9/6/1995 | P | PASS |
|
|
|
09/06/95 311 - R/I ON SLAB 03/OK/U.G. CONDUIT INTERIOR OF BLDG.
|