INSP - Final | 10/12/1995 | 10/13/1995 | 10/13/1995 | A | PASS |
Pat Lass
|
|
|
10/12/95 336 -
|
INSP - Final | 10/13/1995 | 10/13/1995 | 10/13/1995 | P | PASS |
Pat Lass
|
|
|
10/13/95 336 - reinspection
|
INSP - Final | 10/4/1995 | 10/9/1995 | 10/10/1995 | A | NR |
Pat Lass
|
|
|
10/09/95 336 - READY MON AM
|
INSP - Ele Rough-In/Perm Svc | 8/3/1995 | 9/3/1995 | 9/3/1995 | P | PASS |
Pat Lass
|
|
|
P/S-10MIN R/I-15MIN
|
INSP - Ele Rough-In/Perm Svc | 8/23/1995 | 8/23/1995 | 8/23/1995 | A | PART |
Pat Lass
|
|
|
P/S FAIL/15MIN OK TO INSULATE R/I/25MIN
|