INSP - Electrical Rough-In | 11/29/1995 | 11/29/1995 | 11/29/1996 | P | PASS |
|
|
|
3RD FLOOR WEST
|
INSP - Electrical Rough-In | 11/13/1995 | 11/14/1995 | 11/14/1996 | A | PASS |
|
|
|
COVER
|
INSP - Final | 1/16/1996 | 1/18/1996 | 1/18/1996 | P | PASS |
Jim Schmer
|
|
|
CALL BEFORE YOU GO ###-####
|
INSP - Final | 1/12/1996 | 1/16/1996 | 1/16/1996 | A | CANC |
Jim Schmer
|
|
|
THIS WILL BE READY ON THE 16TH AM 3RD FLOOR WEST WING THEY CHANGED THIS UNTIL WED
|
INSP - Framing/ Rough-in | 11/29/1995 | 11/29/1995 | 11/29/1995 | | PART |
|
|
|
/ / 311 - 09/OK/PARTIAL/WALLS IN BATHROOM & 4' HIGH ENTRY WALL
|