INSP - Final | 4/16/1996 | 4/17/1996 | 4/17/1996 | P | PASS |
Pat Lass
|
|
|
04/17/96 336 - 1:30 WED PM final Ok
|
INSP - Conference | 3/21/1996 | 3/21/1996 | 3/21/1996 | A | PASS |
|
|
|
|
INSP - Conference | 3/8/1996 | 3/11/1996 | 3/11/1996 | A | PASS |
|
|
|
CONF WITH TOBI OF MITCHEL ELECT NO LONGER ON JOB WANT TO BE FINALED OUT. JUST HOW AT THIS TIME? WILL FIGURE IT OUT.
|
INSP - Final | 12/26/1995 | 12/26/1995 | 12/26/1995 | A | PART |
Pat Lass
|
|
|
PARTIAL FINAL ONLY OK BATHROOMS ONLY THE REST NOT DONE YET 20 MINS CC: TGEILES
|
INSP - Electrical Rough-In | 12/19/1995 | 12/19/1995 | 12/20/1995 | P | PASS |
Pat Lass
|
|
|
12/19/95 336 - SPRINKLER ROOM FRONT SECTION BY FAIRVIEW AVE Partial R/I Ok
|
INSP - Electrical Rough-In | 12/8/1995 | 12/8/1995 | 12/8/1995 | A | PASS |
|
|
|
OK BATH RM D.B. SYSTEMS...
|
INSP - Electrical Rough-In | 12/7/1995 | 12/7/1995 | 12/7/1995 | | PART |
|
|
|
PARTIAL R/I ON 2 BATHROOMS ONLY
|
INSP - Conference | 11/2/1995 | 11/2/1995 | 11/2/1995 | P | PASS |
|
|
|
CONFERENCE WITH BRUCE MITCHELL ELECT SERVICE GROUNDING.
|