INSP - Final | 11/15/1995 | 11/16/1995 | 11/16/1995 | A | CANC |
Jack Frank
|
|
|
11/15/95 315 - transfered to GKahn #311
|
INSP - Electrical Rough-In | 11/9/1995 | 11/9/1995 | 11/9/1995 | P | PASS |
|
|
|
11/09/95 311 - NORTHWEST CORNER OF THE INTERSECTION INSTALL 120 VOLT 20A AT THE CORNER OF CAPITOL BLVD AND MYRTLE FROM AN EXISTING 20 AMP CIRCUIT BREAKER 09/OK - ADDRESS IS 419 S. CAPITOL BL
|
INSP - Final | 11/9/1995 | 11/9/1995 | 11/9/1995 | P | PASS |
|
|
|
11/09/95 311 - 14/OK/FINAL - ADDRESS IS 419 S. CAPITOL BL.
|