INSP - Final | 10/9/1996 | 10/9/1996 | 10/9/1996 | P | PASS |
Pat Lass
|
|
|
10/09/96 336 - would like as early as possible- mike at wrhel's elec. vo ok
|
INSP - Electrical Rough-In | 9/16/1996 | 9/17/1996 | 9/17/1996 | A | PASS |
Marv Burrus
|
|
|
09/17/96 403 - R/I 4 BATHROOMS PHASE 4- ROOMS 114,116,118 AND 120 OK TO
|
ELE - Partial final | 8/30/1996 | 8/30/1996 | 9/3/1996 | P | PASS |
Marv Burrus
|
|
|
08/30/96 403 - 4 rooms
|
INSP - Electrical Rough-In | 7/25/1996 | 7/26/1996 | 7/26/1996 | A | PASS |
Marv Burrus
|
|
|
07/26/96 403 - 4 BATHROOMS
|
ELE - Partial final | 4/24/1996 | 4/24/1996 | 4/24/1996 | P | PASS |
Joe Ray
|
|
|
HE WILL CALL YOU WITH THE ROOMS
|
ELE - Partial final | 3/15/1996 | 3/15/1996 | 3/15/1996 | P | PASS |
Marv Burrus
|
|
|
ROOMS 101,103,105,107
|
INSP - Electrical Rough-In | 2/9/1996 | 2/9/1996 | 2/9/1996 | P | PASS |
Jim Schmer
|
|
|
|
INSP - Electrical Rough-In | 12/8/1995 | 12/8/1995 | 12/8/1995 | P | PART |
|
|
|
4 BATHROOMS 09/ok/partial/4 bathrooms 101,103,105,107
|
INSP - Electrical Rough-In | 12/1/1995 | 12/4/1995 | 12/4/1995 | P | FAIL |
|
|
|
THIS IS READY FOR R/I IN THE PM REMODEL BATHROOMS HALLWAY NEW STORAGE BLDG 09/corr. - RECEPTS. ON LIGHTING CIRC. AND FIXTURES FOR JUNC. BOX, STRAP FLEX CONDUIT.
|