INSP - Permanent service | 11/29/1996 | 11/29/1996 | 11/29/1996 | | FAIL |
Jack Frank
|
|
|
/ / 315 - 1995 street lignting Columbia Village # 17 53 failed cor.and reinspection fee due sent.NEC, 250-94 GED minimum size #8 copper,250-92 provide protection for#8 250-83(c) 110-14(a) jf
|
INSP - Permanent service | 11/22/1996 | 11/22/1996 | 11/22/1996 | | FAIL |
Jack Frank
|
|
|
/ / 315 - 1995 street lighting Columbia Village #17 53 Failed correcti reinspection fee due to be sent to electrical contractor. I need to get JSchmer on how to handle it.
|
INSP - Permanent service | 11/15/1996 | 11/15/1996 | 11/15/1996 | P | FAIL |
Jack Frank
|
|
|
11/15/96 315 - rein Partial 53 inspection failed to many violations at t at. Reinspection fee and correction to be sent to contractor again, when street lights have been inspected jf
|
INSP - Permanent service | 10/11/1996 | 10/11/1996 | 10/11/1996 | | PASS |
Jack Frank
|
|
|
/ / 315 - 53 for street lihgts failed jf correction sent to contractor 110-14(a)
|
INSP - Permanent service | 10/10/1996 | 10/10/1996 | 10/10/1996 | | PART |
Jack Frank
|
|
|
/ / 315 - partial inspection ok jf
|
INSP - Electrical Rough-In | 2/27/1996 | 2/27/1996 | 2/27/1996 | P | CANC |
Jack Frank
|
|
|
02/27/96 315 - we only do the p/s for street lighting, public works does
|