INSP - Final | 2/22/1996 | 2/23/1996 | 2/23/1996 | A | FAIL |
Pat Lass
|
|
|
02/22/96 336 - final disapproved bathroom gfci recep.
|
INSP - Final | 2/23/1996 | 2/23/1996 | 2/23/1996 | P | PASS |
Pat Lass
|
|
|
02/23/96 336 - REINSPECTION final ok
|
INSP - Ele Rough-In/Perm Svc | 12/15/1995 | | 12/15/1995 | | PASS |
|
|
|
|
INSP - Ele Rough-In/Perm Svc | 12/13/1995 | 12/13/1995 | 12/13/1995 | P | FAIL |
|
|
|
NOT READY TALKED WITH B AND B ELECT.
|