INSP - Final | 9/16/1996 | 9/16/1996 | 9/16/1996 | | PASS |
Marv Burrus
|
|
|
SENT FROM JACK. / / 403 - CORRECTIONS COMPLETED...MB.
|
INSP - Final | 9/16/1996 | 9/16/1996 | 9/16/1996 | P | CANC |
Jack Frank
|
|
|
SENT FROM JACK...MB CORRECTIONS COMPLETED.
|
INSP - Final | 9/9/1996 | 9/9/1996 | 9/9/1996 | P | FAIL |
Jack Frank
|
|
|
09/09/96 315 - 14 failed cor. posted NEC,250-113 &114(a),110-12 (a) 110-3(b),422-21(b),334-10(a), 210-7 (a)&(b) jf
|
INSP - Final | 2/26/1996 | 2/27/1996 | 2/27/1996 | A | CANC |
Jack Frank
|
|
|
02/26/96 315 - no 14 inspection is for a 53 jf
|
INSP - Permanent service | 2/27/1996 | 2/27/1996 | 2/27/1996 | | PASS |
Jack Frank
|
|
|
/ / 315 - 53 ok jf u/g new com.
|
INSP - Conference | 2/20/1996 | 2/20/1996 | 2/20/1996 | P | PASS |
Jack Frank
|
|
|
02/20/96 315 - 01 ok jf
|
INSP - Electrical Rough-In | 2/6/1996 | 2/7/1996 | 2/7/1996 | A | PASS |
Jack Frank
|
|
|
02/06/96 315 - THEY WILL CALL TO SCHEDULE WITH YOU 09 ok jf com. new jf
|