INSP - Final | 6/19/1996 | 6/21/1996 | 6/21/1996 | A | PASS |
Marv Burrus
|
|
|
06/20/96 403 - 1 AND 2ND FLOORS AND THE ELEVATOR YOU NO WHATS HAPPENING YOU FINALED THE 1 AND 2ND FLOORS AND THE BASEMENT JUST THE ELEVATORS NEE BE LOOKED AT-DONT KNOW SORRY...elevator only phase left to final now. 40
|
INSP - Final | 5/31/1996 | 5/31/1996 | 6/3/1996 | P | PASS |
Marv Burrus
|
|
|
05/31/96 403 - BASEMENT FINAL
|
INSP - Final | 5/16/1996 | 5/17/1996 | 5/17/1996 | A | PAS |
Marv Burrus
|
|
|
PARTIAL 1ST. 2ND. FLOOR ONLY.
|
INSP - Electrical Rough-In | 4/17/1996 | 4/17/1996 | 4/18/1996 | P | PART |
Marv Burrus
|
|
|
PARTIAL ON STAIRWELL
|
INSP - Electrical Rough-In | 3/27/1996 | 3/27/1996 | 3/27/1996 | P | PART |
Marv Burrus
|
|
|
3 BATHS AND 3 ROOMS IN THE BASEMENT..
|
INSP - Temporary occupancy | 3/27/1996 | 3/27/1996 | 3/27/1996 | P | PASS |
Marv Burrus
|
|
|
1ST FLOOR, 4 ROOMS ONLY Room no.'s: 113,114,115,116(Church Daycare).
|
INSP - Temporary occupancy | 3/27/1996 | 3/27/1996 | 3/27/1996 | P | PASS |
Marv Burrus
|
|
|
1ST FLOOR, 4 ROOMS ONLY Room no.'s: 113,114,115,116(Church Daycare).
|
INSP - Electrical Rough-In | 2/20/1996 | 2/20/1996 | 2/20/1996 | P | PASS |
Marv Burrus
|
|
|
|
INSP - Electrical Rough-In | 2/5/1996 | 2/5/1996 | 2/5/1996 | P | PASS |
Jim Schmer
|
|
|
R/I ON STAIRCASE, 1ST FLOOR AND 2 BATHROOMS
|
INSP - Electrical Rough-In | 1/23/1996 | 1/23/1996 | 1/23/1996 | P | PASS |
Jim Schmer
|
|
|
1ST PRESBETYTERIAN CHURCH
|