INSP - Final | 5/1/1996 | 5/1/1996 | 5/1/1996 | P | PASS |
Marv Burrus
|
|
|
SIGN OFF CARD ON 5TH FLOOR...
|
INSP - Electrical Rough-In | 4/8/1996 | 4/8/1996 | 4/8/1996 | P | PASS |
Marv Burrus
|
|
|
|
INSP - Electrical Rough-In | 4/1/1996 | 4/1/1996 | 4/2/1996 | P | PASS |
Marv Burrus
|
|
|
ceiling cover
|
INSP - Electrical Rough-In | 3/14/1996 | 3/15/1996 | 3/15/1996 | A | PASS |
Marv Burrus
|
|
|
WALL R/I ON THE 5TH FLOOR..STRUCTURAL #BLD96-0376. ADD ELECTRICAL OUTLETS IN ELEC ROOMS, ADD CABLE TRAY AND UPS IN 5TH FLOOR COMPUTER ROOM.
|