INSP - Final | 7/31/1996 | 7/31/1996 | 7/31/1996 | A | PASS |
|
|
|
|
INSP - Final | 7/30/1996 | 7/30/1996 | 7/30/1996 | P | CANC |
|
|
|
Meet with Better Homes on 07-31-96 @ 8:30 am
|
INSP - Final | 7/26/1996 | 7/29/1996 | 7/29/1996 | P | FAIL |
|
|
|
LATE PM PLEASE 210-8-A-3 No power recept front & no power recept rear
|
INSP - Final | 7/25/1996 | 7/25/1996 | 7/25/1996 | P | CANC |
|
|
|
Cancelled by Electrical Contractor
|
INSP - Permanent service | 7/3/1996 | 7/3/1996 | 7/3/1996 | P | PASS |
Pat Lass
|
|
|
07/03/96 336 - REINSPECTION ON THE GROUND P/S Ok per JSchmer
|
INSP - Permanent service | 5/31/1996 | 6/3/1996 | 6/3/1996 | A | FAIL |
|
|
|
THIS WAS TO LOOK AT NEW ELECTRODE SYSTEM NOT READY -CALLED ELECT TO HAVE CLEAN BEFORE CONCRETE IS POURED.
|
INSP - Ele Rough-In/Perm Svc | 5/2/1996 | 5/2/1996 | 5/2/1996 | P | PART |
|
|
|
15 ROOMS A/C 100 AMPS R/I OK, SERVICE FAILED 250-81
|