INSP - Final | 9/13/1996 | 9/13/1996 | 9/13/1996 | P | PASS |
Pat Lass
|
|
|
09/13/96 336 - AS EARLY AS POSSIBLE final ok
|
INSP - Final | 9/12/1996 | 9/12/1996 | 9/12/1996 | P | FAIL |
Pat Lass
|
|
|
09/12/96 336 - final disapproved GFCI outside recep
|
INSP - Final | 9/6/1996 | 9/9/1996 | 9/9/1996 | A | NH |
Pat Lass
|
|
|
09/09/96 336 - no access
|
INSP - Final | 9/4/1996 | 9/5/1996 | 9/5/1996 | A | CANC |
Pat Lass
|
|
|
09/05/96 336 - canceled
|
INSP - Permanent service | 7/1/1996 | 7/1/1996 | 7/1/1996 | | FAIL |
Jack Frank
|
|
|
/ / 315 - 53 failed jf cor. posted and $25:00 reinspection fee due pos NEC,110-3(b)shall torque bolt till it breaks as manufacture states
|
INSP - Permanent service | 6/28/1996 | 7/1/1996 | 7/1/1996 | A | CANC |
Pat Lass
|
|
|
06/28/96 336 - gave to Jack
|
INSP - Permanent service | 7/1/1996 | 7/1/1996 | 7/1/1996 | | PASS |
Jack Frank
|
|
|
/ / 315 - 53 ok jf cor. made u/g new 400a
|
INSP - Electrical Rough-In | 5/14/1996 | 5/14/1996 | 6/28/1996 | P | PASS |
Pat Lass
|
|
|
06/28/96 336 - REINSPECTION 5-14 by Jack done
|
INSP - Permanent service | 6/24/1996 | 6/25/1996 | 6/25/1996 | A | FAIL |
Pat Lass
|
|
|
06/24/96 336 - REINSPECTION corrections not made posted $25 fee due
|
INSP - Permanent service | 6/7/1996 | 6/7/1996 | 6/7/1996 | P | FAIL |
Pat Lass
|
|
|
06/07/96 336 - REINSPECTION disapproved posted fee due $25 lugs too big and bolt not torqued 110-3
|
INSP - Electrical Rough-In | 5/29/1996 | 5/30/1996 | 5/30/1996 | A | FAIL |
Pat Lass
|
|
|
05/29/96 336 - P/S disapproveed id. neutral lug size and bonding
|
INSP - Ele Rough-In/Perm Svc | 5/14/1996 | 5/14/1996 | 5/15/1996 | P | CANC |
Pat Lass
|
|
|
05/14/96 336 - south side of bld 28 rooms 4 a/c 4OO AMPS done by Jack
|