INSP - Final | 8/26/1996 | 8/26/1996 | 8/26/1996 | P | PASS |
Pat Lass
|
|
|
08/26/96 336 - REINSPECTION/ EARLY PM IF POSSIBLE final Ok
|
INSP - Final | 8/22/1996 | 8/23/1996 | 8/23/1996 | P | PART |
Pat Lass
|
|
|
08/23/96 336 - AROUND 1:00 IF POSSIBLE Temp Occu Ok
|
ELE - Partial final | 8/21/1996 | 8/21/1996 | 8/21/1996 | P | PART |
Pat Lass
|
|
|
08/21/96 336 - final partial
|
INSP - Electrical Rough-In | 8/16/1996 | 8/19/1996 | 8/19/1996 | A | PASS |
Pat Lass
|
|
|
08/19/96 336 - CEILING ROUGH IN RE-INSPECTION ok
|
INSP - Electrical Rough-In | 8/15/1996 | 8/16/1996 | 8/16/1996 | P | FAIL |
Pat Lass
|
|
|
PARTIAL ROUGH-IN (CEILING) securing of MC cable to ceiling
|
INSP - Permanent service | 8/8/1996 | 8/9/1996 | 8/9/1996 | A | PASS |
Jack Frank
|
|
|
08/09/96 315 - reinspection 53 ok jf u/g new com.
|
INSP - Permanent service | 8/5/1996 | 8/6/1996 | 8/6/1996 | A | FAIL |
Jack Frank
|
|
|
08/06/96 315 - LONESTAR REST.- REINSPECTION 53 failed cor. posted NEC,1 proper clearence and service panel door shall open at least 90 degrees j
|
INSP - Electrical Rough-In | 7/5/1996 | 7/8/1996 | 7/7/1996 | A | PASS |
Pat Lass
|
|
|
07/05/96 336 - Partial R/I Ok
|
INSP - Electrical Rough-In | 6/28/1996 | 7/1/1996 | 7/1/1996 | A | PASS |
Pat Lass
|
|
|
06/28/96 336 - Partial R/I ok ONLY
|
INSP - Ground work | 6/17/1996 | 6/17/1996 | 6/17/1996 | P | PASS |
Pat Lass
|
|
|
06/17/96 336 - ground work ok 4 pole bases
|
INSP - Ground work | 5/30/1996 | 5/31/1996 | 5/31/1996 | A | PASS |
Pat Lass
|
|
|
05/31/96 336 - $59,454.00-BLD96-0205 ground work ok
|