INSP - Final | 9/16/1996 | 9/17/1996 | 9/17/1996 | P | PASS |
Pat Lass
|
|
|
09/17/96 336 - final Ok
|
INSP - Electrical Rough-In | 7/25/1996 | 7/26/1996 | 7/26/1996 | P | PASS |
Pat Lass
|
|
|
rough-in ok
|
INSP - Electrical Rough-In | 7/24/1996 | 7/25/1996 | 7/25/1996 | A | NR |
Pat Lass
|
|
|
07/24/96 336 - not ready conf only
|