INSP - Final | 5/7/1997 | 5/8/1997 | 5/8/1997 | A | PASS |
Marv Burrus
|
|
|
05/08/97 403 - any time but not friday. SIGNED OCCUPANCY REQUEST FINAL...MB
|
INSP - Final | 11/27/1996 | 11/27/1996 | 11/27/1996 | P | PASS |
Marv Burrus
|
|
|
JRAY PREVEIOUSLY PASSED TEMP/ OCCUP...MB
|
ELE - Partial final | 11/18/1996 | 11/20/1996 | 11/20/1996 | A | PASS |
Joe Ray
|
|
|
11/20/96 404 - OFFICE MAX/ FOR TEMP OCCUP.
|
INSP - Ele Rough-In/Perm Svc | 9/20/1996 | 9/23/1996 | 9/23/1996 | A | CANC |
Marv Burrus
|
|
|
PARTIAL CEILING SENT TO JOE...MB
|
INSP - Electrical Rough-In | 9/4/1996 | 9/4/1996 | 9/4/1996 | P | PASS |
Marv Burrus
|
|
|
09/04/96 403 - WALL ROUGH IN -- AS EARLY AS POSSIBLE
|
INSP - Electrical Rough-In | 8/15/1996 | 8/15/1996 | 8/15/1996 | | PASS |
Jack Frank
|
|
|
08/15/96 315 - NO ONE WILL BE AT THE SITE AFTER 4PM. 03 ok jf
|
INSP - Electrical Rough-In | 8/15/1996 | 8/15/1996 | 8/15/1996 | | PASS |
Jack Frank
|
|
|
08/15/96 315 - NO ONE WILL BE AT THE SITE AFTER 4PM. 03 ok jf
|
INSP - Electrical Rough-In | 8/15/1996 | 8/15/1996 | 8/15/1996 | P | PASS |
Jack Frank
|
|
|
NO ONE WILL BE AT THE SITE AFTER 4PM. 09 ok jf
|