INSP - Final | 5/23/1997 | 5/27/1997 | 5/27/1997 | A | PASS |
Marv Burrus
|
|
|
05/26/97 403 - LEFT SURVEY NOTICE; NO OCCUPANCY CARD LEFT FOR SIGNING...
|
INSP - Final | 5/1/1997 | 5/2/1997 | 5/2/1997 | A | CANC |
Marv Burrus
|
|
|
05/01/97 403 - PHASE 3 HAS CARD FOR YOU TO SIGN. NOT READY FOR FINAL, WAITING FOR FIXTURES...MB
|
INSP - Temporary occupancy | 5/2/1997 | 5/2/1997 | 5/2/1997 | | PASS |
Marv Burrus
|
|
|
/ / 403 - LOCATED OCCUPANCY CARD FOR SIGNING...MB
|
INSP - Temporary occupancy | 5/2/1997 | 5/2/1997 | 5/2/1997 | | PASS |
Marv Burrus
|
|
|
/ / 403 - LOCATED OCCUPANCY CARD FOR SIGNING...MB
|
INSP - Final | 4/23/1997 | 4/24/1997 | 4/25/1997 | P | CANC |
Marv Burrus
|
|
|
04/24/97 403 - PHASE 3 WAITING ON SOME FIXTURES TO INSTALL...MB
|
INSP - Temporary occupancy | 4/25/1997 | 4/24/1997 | 4/25/1997 | | PASS |
Marv Burrus
|
|
|
/ / 403 - NOT READY FOR FINAL, NEED SOME FIXTURES NSTALLED...MB
|
INSP - Temporary occupancy | 4/25/1997 | 4/24/1997 | 4/25/1997 | | PASS |
Marv Burrus
|
|
|
/ / 403 - NOT READY FOR FINAL, NEED SOME FIXTURES NSTALLED...MB
|
ELE - Partial final | 4/2/1997 | 4/3/1997 | 4/3/1997 | A | PASS |
Marv Burrus
|
|
|
04/02/97 403 - PARTIAL FINAL FOR PHASE II AND GYMNASIUM EMERGENCY LIGHTS ONLY...MB
|
INSP - Temporary occupancy | 4/3/1997 | 4/3/1997 | 4/3/1997 | P | PASS |
Marv Burrus
|
|
|
04/03/97 403 -
|
INSP - Temporary occupancy | 4/3/1997 | 4/3/1997 | 4/3/1997 | P | PASS |
Marv Burrus
|
|
|
04/03/97 403 -
|
INSP - Final | 3/17/1997 | 3/17/1997 | 3/17/1997 | | PART |
Marv Burrus
|
|
|
/ / 403 - NOT READY FOR FINAL TEMPORARY OCCUPANCY ONLY...MB
|
INSP - Final | 3/14/1997 | 3/17/1997 | 3/17/1997 | A | CANC |
Marv Burrus
|
|
|
03/16/97 403 - basement WAITING FOR MATERIAL FOR PANELBOARDS, EXIT LIGHT, AND CONNECTIONS FOR PUMP...MB
|
INSP - Electrical Rough-In | 3/14/1997 | 3/14/1997 | 3/16/1997 | P | PASS |
Marv Burrus
|
|
|
03/14/97 403 - phase 3 CEILING ONLY...MB
|
INSP - Electrical Rough-In | 3/5/1997 | 3/5/1997 | 3/5/1997 | P | PASS |
Marv Burrus
|
|
|
03/05/97 403 - PARTIAL, WALLS ONLY...MB
|
INSP - Electrical Rough-In | 1/21/1997 | 1/21/1997 | 1/22/1997 | P | PASS |
Joe Ray
|
|
|
01/21/97 404 - R/I..2 PHASE
|
INSP - Electrical Rough-In | 1/9/1997 | 1/9/1997 | 1/9/1997 | | PASS |
Marv Burrus
|
|
|
/ / 403 - partial ele-r/i, wall in basement...mb
|
INSP - Electrical Rough-In | 1/8/1997 | 1/9/1997 | 1/9/1997 | A | CANC |
Joe Ray
|
|
|
01/08/97 404 - SENT TO MARV
|
INSP - Final | 1/2/1997 | 1/3/1997 | 1/3/1997 | A | PART |
Joe Ray
|
|
|
01/02/97 404 - phase one temp. occupancy
|
INSP - Electrical Rough-In | 11/12/1996 | 11/12/1996 | 11/13/1996 | P | PASS |
Joe Ray
|
|
|
11/12/96 404 -
|
INSP - Electrical Rough-In | 10/15/1996 | 10/16/1996 | 10/16/1996 | A | PASS |
Joe Ray
|
|
|
10/16/96 404 - COVER FOR A SLAB
|
INSP - Electrical Rough-In | 9/20/1996 | 9/23/1996 | 9/23/1996 | A | PASS |
Joe Ray
|
|
|
09/20/96 404 - PARTIAL COVER ì
|
INSP - Electrical Rough-In | 9/12/1996 | 9/13/1996 | 9/13/1996 | A | PASS |
Joe Ray
|
|
|
09/12/96 404 - PARTIAL ROUGH-IN
|
INSP - Electrical Rough-In | 9/11/1996 | 9/12/1996 | 9/12/1996 | A | FAIL |
Joe Ray
|
|
|
09/11/96 404 - PARTIAL support pipe within three feet of box ground metal boxes
|