INSP - Final | 9/26/1996 | 9/26/1996 | 9/26/1996 | P | PASS |
|
|
|
|
INSP - Temporary occupancy | 9/19/1996 | 9/19/1996 | 9/19/1996 | P | CANC |
|
|
|
Given to Pat Lass
|
INSP - Temporary occupancy | 9/19/1996 | 9/19/1996 | 9/19/1996 | P | CANC |
|
|
|
Given to Pat Lass
|
INSP - Electrical Rough-In | 9/18/1996 | 9/18/1996 | 9/18/1996 | A | PART |
|
|
|
|
INSP - Electrical Rough-In | 8/16/1996 | 8/19/1996 | 8/19/1996 | A | PASS |
|
|
|
|
INSP - Permanent service | 8/14/1996 | 8/14/1996 | 8/14/1996 | P | PASS |
|
|
|
|
INSP - Conference | 7/30/1996 | 7/30/1996 | 7/30/1996 | | PASS |
Jim Schmer
|
|
|
conf on grounding 400a svc.
|
INSP - Electrical Rough-In | 7/23/1996 | 7/24/1996 | 7/24/1996 | A | CANC |
|
|
|
Gave to Pat Lass
|