INSP - Final | 9/9/1996 | 9/10/1996 | 9/10/1996 | P | PASS |
Marv Burrus
|
|
|
09/10/96 403 - THE FINAL SCHEDULED FOR 7/24 SHOULD HAVE BEEN FOR PERMANE THE FINAL
|
INSP - Final | 7/24/1996 | 7/24/1996 | 7/24/1996 | P | PASS |
Marv Burrus
|
|
|
07/24/96 403 - GFCI INSTALLED...403MB
|
INSP - Electrical Rough-In | 7/23/1996 | 7/23/1996 | 7/23/1996 | P | PASS |
Marv Burrus
|
|
|
07/23/96 403 - EARLY PM PLEASE. THIS WAS SUPPOSED TO BE SCHEDULED FOR YE ELE/R-I BASEMENT PARTIAL..403MB
|