INSP - Final | 12/13/1996 | 12/16/1996 | 12/16/1996 | A | PASS |
Joe Ray
|
|
|
12/13/96 404 -
|
INSP - Final | 12/13/1996 | 12/13/1996 | 12/13/1996 | P | NR |
Jack Frank
|
|
|
12/13/96 315 - 3;30 nr jf talked to Boise Basin they said they will cal 12/16/96 Monday AM, they said it will not be ready today
|
INSP - Permanent service | 8/13/1996 | 8/13/1996 | 8/13/1996 | P | PASS |
Joe Ray
|
|
|
08/13/96 404 -
|
INSP - Ground work | 8/8/1996 | 8/9/1996 | 8/9/1996 | A | PASS |
|
|
|
#4 copper for ground system - ok
|
INSP - Ele Rough-In/Perm Svc | 8/5/1996 | 8/6/1996 | 8/6/1996 | A | CANC |
|
|
|
22 ROOMS see seperate inspections
|
INSP - Electrical Rough-In | 8/6/1996 | 8/6/1996 | 8/6/1996 | A | PASS |
|
|
|
|
INSP - Permanent service | 8/6/1996 | 8/6/1996 | 8/6/1996 | A | FAIL |
|
|
|
250-83-C No re-bar ground
|