Information based on query as of Tuesday, July 2, 2024.
Permit Information
Permit NumberELE96-02561
StatusFinaled
Name POWER ELECTRIC
Site Address 400 S BROADWAY AVE
Project NameMK - PLAZA I
Customer Number 
ePlanReview 
Description
08/05/96/ MK-PLAZA 1/BASEMENT THROUGH 6TH FLOOR/VARIOUS DIMS AND INSTALLATION OF ELECTRICAL CIRCUITS THROUGH OUT BLD AND ADDITIONAL ELEC PANELS AND TRANSFORMERS/BLD96-1484/$149,818.00/FINAL CERT OF VALUE ON FILE. AJB
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Conference3/20/19973/20/19973/20/1997 PASS
DetailsMarv Burrus
/ / 403 - DISCUSSED CLEARANCES IN FRONT OF PANEL AS PER JSCHMER 6TH FL
INSP - Conference3/20/19973/20/19973/20/1997APASS
DetailsJim Schmer
conference on clearence on panel at 6th floor-ok-jms
INSP - Final3/19/19973/20/19973/20/1997PPASS
DetailsMarv Burrus
03/20/97 403 - FINALED 1ST., 2ND, 4TH, AND 6TH FLOORS. JRAY FINALED BAS FLOORS.
INSP - Final3/17/19973/19/19973/19/1997APART
DetailsMarv Burrus
PLAZA ONE AND AND PANEL ROOMS PANEL ROOMS ON 5TH, 4TH, 2ND, 1ST, AND BASEMENT ONLY...MB
INSP - Electrical Rough-In12/30/199612/31/199612/31/1996APASS
DetailsMarv Burrus
12/30/96 403 - 1st floor east and west entry INSPECTED AND PASSED BY JRAY ON 12-30-96.
INSP - Electrical Rough-In12/13/199612/13/199612/13/1996PPASS
DetailsJoe Ray
12/13/96 404 - ROUGH CEILING COVER..6TH FLOOR CENTER AREA
ELE - Partial final12/5/199612/6/199612/6/1996APASS
DetailsJoe Ray
12/05/96 404 - 3RD AND 5TH FLOOR
INSP - Electrical Rough-In12/5/199612/6/199612/6/1996APASS
DetailsJoe Ray
12/05/96 404 - PARTIAL R/I ON 6TH FLOOR NORTH AND SOUTH SIDES
INSP - Electrical Rough-In11/25/199611/26/199611/26/1996APASS
DetailsJoe Ray
11/25/96 404 - ceiling cover 3rd floor southside
INSP - Electrical Rough-In11/21/199611/22/199611/22/1996APASS
DetailsJoe Ray
11/21/96 404 - rough-in 3rd floor/final for all of basement. 3RD FLOOR NORTHSIDE ONLY BASEMENT TEMP OCCUP.
INSP - Conference11/14/199611/15/199611/15/1996APASS
DetailsJoe Ray
11/14/96 404 - WARREN SAID YOU SET UP TIME ALREADY
INSP - Electrical Rough-In11/7/199611/7/199611/8/1996PFAIL
DetailsJoe Ray
11/07/96 404 - 5TH FLOOR NORTH SIDE/CEILING BCC 4-5-54, 370-23, 410-16, 410-16 348-12, 350-18, 370-16, AND 300-11B
INSP - Electrical Rough-In11/6/199611/7/199611/7/1996ACANC
DetailsJoe Ray
5TH FLOOR AM/ AFTER 9:00 PLEASE SENT FROM JOE...MB
INSP - Electrical Rough-In11/7/199611/7/199611/7/1996APASS
DetailsMarv Burrus
5TH FLOOR CEILING AREA, SOUTH-SIDE; PARTIAL R/I.
INSP - Electrical Rough-In8/28/19968/28/19968/28/1996PPASS
DetailsMarv Burrus
08/28/96 403 - basement east end/ reinspection 4 ROOMS; B-13 THRU B-16 ONLY...MB/403.
INSP - Electrical Rough-In8/26/19968/27/19968/27/1996PPASS
DetailsMarv Burrus
08/27/96 403 - BASEMENT IN 2 PLACES- EAST END AND NORTHWEST CORNER READY BY 3:00.
INSP - Electrical Rough-In8/15/19968/15/19968/15/1996PPASS
DetailsJack Frank
09 ok jf
INSP - Electrical Rough-In8/14/19968/14/19968/14/1996PPASS
DetailsMarv Burrus
08/14/96 403 - PARTIAL R/I: OFFICES, B-20& B-21...MB
INSP - Electrical Rough-In8/5/19968/6/19968/6/1996APASS
DetailsMarv Burrus
08/06/96 403 - MK PLAZA-1/ BASEMENT THROUGH 6TH FLOORS/ VARIOUS DIMS AND AND ADDITIONAL PANELS AND TRANSFORMERS. THIS INSPECTION FOR WALLS. BLD96 VALUE $149,818.00