INSP - Conference | 11/4/1996 | 11/4/1996 | 11/4/1996 | P | PASS |
Pat Lass
|
|
|
11/04/96 336 - ###-#### - steve pager number please call for time ok
|
INSP - Electrical Rough-In | 10/30/1996 | 10/31/1996 | 10/31/1996 | A | NR |
Pat Lass
|
|
|
10/31/96 336 - BOISE AIR TERMINAL EAST PORTION 1ST FLOOR AND CRAWL SPACE SYSTEM UPGRADE wORK NOT STARTED YET
|
INSP - Electrical Rough-In | 10/30/1996 | 10/30/1996 | 10/30/1996 | P | CANC |
Pat Lass
|
|
|
BOISE AIR TERMINAL-EAST PORTION-1ST FLOOR AND CRAWL SPACE/ BAGGAGE CONVEYOR SYSTEM REFURBISHMENT
|