INSP - Final | 12/5/1996 | 12/6/1996 | 12/6/1996 | A | PASS |
Pat Lass
|
|
|
12/06/96 336 - READY 11:00 ok
|
INSP - Final | 12/3/1996 | 12/4/1996 | 12/4/1996 | A | FAIL |
|
|
|
information not complete will go back and talk to jim s.
|
INSP - Final | 11/25/1996 | 11/25/1996 | 11/25/1996 | P | FAIL |
|
|
|
re-inspect final --changed into conference with Chris (C-H elect.)
|
INSP - Final | 11/22/1996 | 11/22/1996 | 11/22/1996 | A | FAIL |
|
|
|
305-3-B Cords from ceiling not temp wiring / 400-10 cords & transformer pull at joints and terminals / 110-3-B & BCC 4-5-60 beacon lites not listed / 410-56-I raised comp. recep require 2 screws / also will need access to above ceiling as the portion was not seen on r/i.
|
INSP - Final | 11/21/1996 | 11/21/1996 | 11/21/1996 | P | FAIL |
|
|
|
laser storm/ any questions call chris at ###-#### --Pat did r/i - he is going by with me today
|
INSP - Electrical Rough-In | 11/5/1996 | 11/6/1996 | 11/6/1996 | A | CANC |
Marv Burrus
|
|
|
11/06/96 403 - CALL CHRIS AT ###-#### BEFORE YOU GO OUT - DOOR IS LOCKED YOU IN SENT TO PAT...MB
|