INSP - Final | 2/4/1997 | 2/5/1997 | 2/5/1997 | A | PASS |
Marv Burrus
|
|
|
02/04/97 403 - KEY TO LEFT OF DOOR CORRECTIONS COMPLETED...MB
|
INSP - Final | 2/3/1997 | 2/3/1997 | 2/3/1997 | P | FAIL |
Marv Burrus
|
|
|
02/03/97 403 - KEY IS TO LEFT OF FRONT DOOR CORRECTIONS NOT COMPLETED, REINSPECTION FEE REQUESTED...MB
|
INSP - Final | 1/30/1997 | 1/31/1997 | 1/31/1997 | A | FAIL |
Marv Burrus
|
|
|
01/30/97 403 - KEY TO LEFT OF FRONT DOOR BY THE PILLAR NEC: 210-8(A)(1),&(6). BATHROOM AND KITCHEN RECEPTICLES NOT OPERATING CORRECTLY...MB
|
INSP - Ele Rough-In/Perm Svc | 11/13/1996 | 11/13/1996 | 11/13/1996 | P | PASS |
Marv Burrus
|
|
|
11/13/96 403 -
|