INSP - Final | 9/19/1997 | 9/19/1997 | 9/19/1997 | P | PASS |
Joe Ray
|
|
|
09/19/97 404 -
|
INSP - Temporary occupancy | 9/11/1997 | 9/11/1997 | 9/11/1997 | P | PASS |
Joe Ray
|
|
|
09/11/97 404 -
|
INSP - Temporary occupancy | 9/11/1997 | 9/11/1997 | 9/11/1997 | P | PASS |
Joe Ray
|
|
|
09/11/97 404 -
|
INSP - Ground work | 8/6/1997 | 8/8/1997 | 8/8/1997 | A | CANC |
Joe Ray
|
|
|
/ / 404 -
|
INSP - Electrical Rough-In | 8/7/1997 | 8/7/1997 | 8/7/1997 | P | PASS |
Joe Ray
|
|
|
08/07/97 404 - GROUNDING AND OPEN WALL
|
INSP - Ele Rough-In/Perm Svc | 7/23/1997 | 7/23/1997 | 7/23/1997 | P | PASS |
Joe Ray
|
|
|
07/23/97 404 - R/I ON WALLS
|
INSP - Electrical Rough-In | 6/30/1997 | 6/30/1997 | 6/30/1997 | P | PASS |
Joe Ray
|
|
|
06/30/97 404 - hallway 1st floor bathrooms R/I OK
|
INSP - Ground work | 12/19/1996 | 12/19/1996 | 12/19/1996 | P | PART |
Jack Frank
|
|
|
12/19/96 315 - BRIGHTON CAMPUS BLDG #3..PHASE 1..SHELL ONLY..BLD96-2431
|