INSP - Final | 1/2/1997 | 1/2/1997 | 1/2/1997 | P | PASS |
Marv Burrus
|
|
|
01/02/97 403 - CORRECTIONS COMPLETED...MB
|
INSP - Permanent service | 1/2/1997 | 1/2/1997 | 1/2/1997 | | PASS |
Marv Burrus
|
|
|
/ / 403 -
|
INSP - Final | 12/24/1996 | 12/26/1996 | 12/26/1996 | A | FAIL |
Marv Burrus
|
|
|
12/26/96 403 - rough-in/perm/service/final all in one NEC: 230. SERVICE MAST SHALL BE GUYED OR BRACED WHENEVER SERVICE ENTRANCE CONDUCTORS ARE ATTACHED TO MAST. NEC: 250. HOT AND COLD WATER PIPE SHALL BE BONDED BY GRND. C
|