INSP - T/S and Final | 3/3/1997 | 3/3/1997 | 3/3/1997 | P | PASS |
Pat Lass
|
|
|
03/03/97 336 - re-inspection on temp early p.m./they wanted to know if y as soon as its inspected so idaho power can be called.???/pat ok
|
INSP - T/S and Final | 2/10/1997 | 2/11/1997 | 2/11/1997 | A | FAIL |
Pat Lass
|
|
|
02/11/97 336 - disapproved main bonding jumper contamination sheetmetal
|