INSP - Final | 7/15/1997 | 7/16/1997 | 7/16/1997 | A | PASS |
Marv Burrus
|
|
|
07/15/97 403 -
|
INSP - Ele Rough-In/Perm Svc | 5/22/1997 | 5/23/1997 | 5/23/1997 | A | PASS |
Marv Burrus
|
|
|
05/22/97 403 - SURVEY LEFT: NEC: 333-12. PROTECT CABLE WITHIN 6 FT. OF 210-8. G.F.C.I. PROTECTION REQUIRED IN UNFINISHED BASEMENT...MB
|