INSP - Final | 9/25/1997 | 9/26/1997 | 9/26/1997 | A | PASS |
Joe Ray
|
|
|
09/26/97 404 -
|
INSP - Temporary occupancy | 7/11/1997 | 7/14/1997 | 7/14/1997 | A | PASS |
Joe Ray
|
|
|
07/14/97 404 - BUILDING #6
|
INSP - Temporary occupancy | 7/11/1997 | 7/14/1997 | 7/14/1997 | A | PASS |
Joe Ray
|
|
|
07/14/97 404 - BUILDING #6
|
ELE - Partial final | 7/10/1997 | 7/11/1997 | 7/11/1997 | A | PASS |
Joe Ray
|
|
|
07/11/97 404 - CORRIDOR CEILINGS CLEAN ROOM
|
INSP - Final | 7/1/1997 | 7/1/1997 | 7/1/1997 | P | PART |
Joe Ray
|
|
|
HP #6 EAST/WEST 07/01/97 404 - corrider ceiling final- partial
|
INSP - Electrical Rough-In | 6/23/1997 | 6/23/1997 | 6/23/1997 | P | PASS |
Joe Ray
|
|
|
06/23/97 404 - ceiling inspected contact Paul R. digital pager ###-####
|
INSP - Electrical Rough-In | 6/20/1997 | 6/23/1997 | 6/23/1997 | A | FAIL |
Joe Ray
|
|
|
06/23/97 404 - CEILING INSPECTED SAT IN LOBBY FOR TWENTY MINUTES NO ACCESS
|
INSP - Electrical Rough-In | 6/16/1997 | 6/16/1997 | 6/17/1997 | P | PASS |
Joe Ray
|
|
|
06/16/97 404 - Basement wall rough-in
|
INSP - Electrical Rough-In | 5/28/1997 | 5/29/1997 | 5/29/1997 | A | PASS |
Joe Ray
|
|
|
05/28/97 404 - hp #6 inkjet wafer fab area.
|