INSP - Electrical Rough-In | 8/29/1997 | 9/2/1997 | 9/2/1997 | P | PART |
Jack Frank
|
|
|
09/02/97 315 - 1:00 ta 2 lobby building 16 09 ok jf
|
INSP - Conference | 8/28/1997 | 8/28/1997 | 8/28/1997 | A | PASS |
Jim Schmer
|
|
|
meeting with mircron about ul listing
|
INSP - Conference | 8/28/1997 | 8/28/1997 | 8/28/1997 | A | PASS |
Jack Frank
|
|
|
01 with JSchmer and Micron ok jf
|
INSP - Electrical Rough-In | 8/12/1997 | 8/14/1997 | 8/14/1997 | P | PART |
Jack Frank
|
|
|
08/14/97 315 - at 1 p.m. blanket permit/building 16 ta2 lobby will meet the one 03 ok jf
|