INSP - Final | 9/17/1997 | 9/18/1997 | 9/18/1997 | A | PASS |
Jim Schmer
|
|
|
|
INSP - Permanent service | 9/16/1997 | 9/17/1997 | 9/17/1997 | P | PASS |
Marv Burrus
|
|
|
09/16/97 403 - re-inspect GROUNDING CONDUCTOR INSTALLATION COMPLETED.
|
INSP - Permanent service | 9/15/1997 | 9/16/1997 | 9/16/1997 | A | NR |
Marv Burrus
|
|
|
09/16/97 403 - reinspection WILL RESCHEDULE.
|
INSP - Permanent service | 9/15/1997 | 9/15/1997 | 9/15/1997 | P | NR |
Marv Burrus
|
|
|
09/15/97 403 - PERM/SVC NOT READY.
|
INSP - Conference | 9/3/1997 | 9/3/1997 | 9/3/1997 | P | PASS |
Jim Schmer
|
|
|
discussion on wall by panel on 2nd floor
|
INSP - Electrical Rough-In | 9/3/1997 | 9/3/1997 | 9/3/1997 | P | CANC |
Jim Schmer
|
|
|
change to conference
|
INSP - Electrical Rough-In | 8/26/1997 | 8/27/1997 | 8/27/1997 | P | PART |
Marv Burrus
|
|
|
08/27/97 403 - early p.m.
|
INSP - Electrical Rough-In | 8/25/1997 | 8/25/1997 | 8/25/1997 | P | PASS |
Marv Burrus
|
|
|
08/25/97 403 - WALLS, BACK AREA.
|
INSP - Electrical Rough-In | 8/21/1997 | 8/22/1997 | 8/22/1997 | A | PART |
Marv Burrus
|
|
|
08/21/97 403 - as early a.m as possible CEILING R/I.
|
INSP - Electrical Rough-In | 8/19/1997 | 8/19/1997 | 8/19/1997 | P | PART |
Marv Burrus
|
|
|
08/19/97 403 - partial rough-in NORTHEND WALLS AND CEILING ONLY.
|