INSP - Final | 10/23/1997 | 10/23/1997 | 10/23/1997 | P | PART |
Jack Frank
|
|
|
10/23/97 315 - part 14
|
INSP - Ele Rough-In/Perm Svc | 8/27/1997 | 8/27/1997 | 8/27/1997 | P | PASS |
Jack Frank
|
|
|
08/27/97 315 - reinspection 09&53 ok jf 19rms 2a/c 200a u/g new
|
INSP - Ele Rough-In/Perm Svc | 8/25/1997 | 8/25/1997 | 8/25/1997 | | NR |
Jack Frank
|
|
|
/ / 315 - 53&09 not ready talked with Looney Electric, basement needs builder changed it from unfinished to finish jf panel and wires are not terminated in basement
|
INSP - Ele Rough-In/Perm Svc | 8/22/1997 | 8/22/1997 | 8/22/1997 | P | CANC |
Jack Frank
|
|
|
Scheduled by Hello! on 08/22/97 at 10:38:42.
|
INSP - Ele Rough-In/Perm Svc | 8/22/1997 | 8/22/1997 | 8/22/1997 | P | FAIL |
Joe Ray
|
|
|
failed to make jack's corrections
|
INSP - Ele Rough-In/Perm Svc | 8/21/1997 | 8/21/1997 | 8/21/1997 | | NR |
Jack Frank
|
|
|
08/20/97 315 - notice posted 09&53 NR also need prints on job site need
|
INSP - Ele Rough-In/Perm Svc | 8/20/1997 | 8/20/1997 | 8/20/1997 | P | CANC |
Jack Frank
|
|
|
|