INSP - Final | 1/7/1998 | 1/8/1998 | 1/8/1998 | A | PASS |
Marv Burrus
|
|
|
01/07/98 403 -
|
INSP - Electrical Rough-In | 12/15/1997 | 12/16/1997 | 12/16/1997 | P | PART |
Marv Burrus
|
|
|
12/16/97 403 - BOISE SENIOR CENTER. REMAINDER OF ENTRY CEILING.
|
INSP - Electrical Rough-In | 12/11/1997 | 12/11/1997 | 12/11/1997 | P | PASS |
Marv Burrus
|
|
|
12/11/97 403 - READY AFTER 2:00 CEILING FRONT CORIDOOR.
|
INSP - Electrical Rough-In | 12/9/1997 | 12/9/1997 | 12/9/1997 | P | PASS |
Marv Burrus
|
|
|
12/09/97 403 - BOISE SENIOR CENTER CRAFTS AREA R/I.
|
INSP - Electrical Rough-In | 11/24/1997 | 11/25/1997 | 11/25/1997 | A | PASS |
Marv Burrus
|
|
|
11/24/97 403 - rein CORRECTIONS COMPLETED.
|
INSP - Electrical Rough-In | 11/24/1997 | 11/24/1997 | 11/24/1997 | P | FAIL |
Jim Schmer
|
|
|
in existing building corridor.. mud rings not installed..JMS
|
INSP - Electrical Rough-In | 11/17/1997 | 11/17/1997 | 11/17/1997 | P | PASS |
Marv Burrus
|
|
|
CEILING
|
INSP - Electrical Rough-In | 11/12/1997 | 11/12/1997 | 11/13/1997 | P | PART |
Marv Burrus
|
|
|
11/12/97 403 - WALLS R/I.
|