INSP - Final | 10/6/1998 | 10/7/1998 | 10/7/1998 | A | PASS |
Marv Burrus
|
|
|
10/06/98 403 - HERB ###-#### JOB COMPLETION. OK
|
INSP - Electrical Rough-In | 8/25/1998 | 8/25/1998 | 8/25/1998 | P | PART |
Marv Burrus
|
|
|
08/25/98 403 - look at the drive through lanes herb ###-#### BRANCH CIRCUIT TO VACUUM SUCTION MOTORS OF BANK. OK
|
INSP - Final | 7/31/1998 | 7/31/1998 | 7/31/1998 | P | PART |
Marv Burrus
|
|
|
07/31/98 403 - HERB ###-#### TEMP/OCCUP. ONLY
|
INSP - Electrical Rough-In | 7/16/1998 | 7/17/1998 | 7/17/1998 | A | PASS |
Marv Burrus
|
|
|
Herb ###-#### conference DISCUSSED LOCATION FOR SURGE PROTECTION CLEARANCES.
|
INSP - Electrical Rough-In | 7/8/1998 | 7/9/1998 | 7/9/1998 | A | PART |
Jack Frank
|
|
|
07/09/98 315 - partial r/i herb will most likely be on roof. ###-####..t ok
|
INSP - Electrical Rough-In | 6/29/1998 | 6/30/1998 | 6/30/1998 | A | PASS |
Jim Schmer
|
|
|
ceiling grid herb ###-####
|
INSP - Electrical Rough-In | 5/19/1998 | 5/20/1998 | 5/20/1998 | A | PART |
Marv Burrus
|
|
|
05/19/98 403 - HERB 1-###-#### CEILING R/I; EQUIPTMENT ROOM AND CONNECTING BATHROOM.
|
INSP - Electrical Rough-In | 4/30/1998 | 5/1/1998 | 5/1/1998 | A | PART |
Marv Burrus
|
|
|
04/30/98 403 - herb ###-#### INTERIOR WALLS R/I.
|
INSP - Electrical Rough-In | 4/27/1998 | 4/28/1998 | 4/28/1998 | A | PART |
Marv Burrus
|
|
|
04/27/98 403 - HERB/###-#### - PARTIAL R/I PERIMETER WALLS R/I.
|
INSP - Electrical Rough-In | 3/24/1998 | 3/25/1998 | 3/24/1998 | A | PASS |
Marv Burrus
|
|
|
uderground slab herb ###-#### NEEDED INSPECTION DAY OF REQUEST.
|