INSP - Final | 4/22/1998 | 4/22/1998 | 4/22/1998 | P | FAIL |
Jack Frank
|
|
|
04/22/98 315 - ###-####/JIM - FINAL ELE. ON SERVICE CHANGE..trans jms.. cor. and $42.00 reinspection fee due to much to note see posted correcti notice at job site, or jf for info
|
INSP - Final | 4/21/1998 | 4/21/1998 | 4/21/1998 | P | NH |
Marv Burrus
|
|
|
04/21/98 403 - ###-#### final LEFT CARD. ALSO, CALLED CONTRACTOR AND LEFT MESSAGE TO RESCHEDULE.
|
INSP - Final | 4/1/1998 | 4/2/1998 | 4/2/1998 | P | CANC |
Marv Burrus
|
|
|
READY 3:30--PERM SERV AND 2 CIRCUIT EXTENSIONS BACK PORCH..rained out to muddy..JMS..
|