Final | 2/23/2001 | 2/23/2001 | 2/23/2001 | P | PASS |
Jack Frank
|
|
|
###-#### ok 2/23/2001 2:44:08 PM
|
Final | 2/13/2001 | 2/13/2001 | 2/13/2001 | P | FAIL |
Jack Frank
|
|
|
###-#### 410-8 and gfci not wired right 2/13/2001 2:49:07 PM
|
Electrical Rough-In | 2/7/2001 | 2/8/2001 | 2/8/2001 | A | FAIL |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 02/07/2001 at 14:07:29. Contact: ###-####. correction: two gfci/s in the kitchen were not wired properly - the light in the closet was moved properly 2/8/2001 4:46:04 PM
|
Final | 1/21/2000 | 1/21/2000 | 1/21/2000 | P | FAIL |
Pat Lass
|
|
|
Nick ###-#### please call the cell phone so that he can meet you and let you in ###-#### Closet light clearance GFCI kitchen. 1/25/00 12:02:29 PM
|
INSP - Final | 12/9/1998 | 12/9/1998 | 12/9/1998 | P | PART |
Jack Frank
|
|
|
12/09/98 315 - R/I OK NO FINAL
|
INSP - Electrical Rough-In | 10/9/1998 | 10/9/1998 | 10/9/1998 | | PART |
Jack Frank
|
|
|
/ / 315 - r/i ok partial res. rem. 6rms
|
INSP - Final | 10/8/1998 | 10/9/1998 | 10/9/1998 | P | CANC |
Jack Frank
|
|
|
10/09/98 315 - nik ###-#### see added r/i inspection request jf
|
INSP - Electrical Rough-In | 9/23/1998 | 9/25/1998 | 9/25/1998 | P | PART |
Pat Lass
|
|
|
09/25/98 336 - ok
|
INSP - Electrical Rough-In | 7/20/1998 | 7/20/1998 | 7/20/1998 | P | PASS |
Jack Frank
|
|
|
07/20/98 315 - nikolay ###-#### reinspection..trans jms.. p/s ok o/h rec. 200a
|
INSP - Electrical Rough-In | 7/13/1998 | 7/13/1998 | 7/14/1998 | P | PART |
Pat Lass
|
|
|
07/13/98 336 - ###-#### ok
|
INSP - Final | 7/7/1998 | 7/7/1998 | 7/8/1998 | P | PART |
Pat Lass
|
|
|
07/08/98 336 - after 4 Nick Gotra ###-#### ok
|
INSP - Final | 7/1/1998 | 7/1/1998 | 7/1/1998 | P | FAIL |
Pat Lass
|
|
|
07/01/98 336 - service ###-#### Nick Gotra not ready require concrete encased electrode
|