INSP - Final | 8/27/1998 | 8/27/1998 | 8/28/1998 | P | PASS |
Marv Burrus
|
|
|
###-#### 18th floor OFFICE REMODEL.
|
INSP - Electrical Rough-In | 7/28/1998 | 7/29/1998 | 7/29/1998 | A | PASS |
Marv Burrus
|
|
|
07/28/98 403 - r/i on the tech room nancy ###-####
|
INSP - Electrical Rough-In | 7/27/1998 | 7/28/1998 | 7/27/1998 | A | PART |
Marv Burrus
|
|
|
ON THE 18TH FLOOR ENTERPRISE ###-#### NANCY 2 WALLS R/I. OK
|
INSP - Electrical Rough-In | 7/24/1998 | 7/27/1998 | 7/24/1998 | A | N.R. |
Marv Burrus
|
|
|
###-#### NANCY WANTED WORK INSPECTED ON: 07-24-98; WORK WASN'T COMPLETED FOR INSPECTION.
|
INSP - Electrical Rough-In | 6/24/1998 | 6/25/1998 | 6/25/1998 | A | PART |
Jack Frank
|
|
|
06/25/98 315 - nancy ###-####-18th floor..trans jms.. ok 1 wall
|